Axine Water Technologies
Persistent contaminants.
Destroyed at the source.

Axine’s electraCLEAR® technology destroys PFAS, APIs, solvents and other persistent organics in industrial wastewater, reducing dependence on off-site disposal for difficult contaminant streams.

up to
0
%
PFAs Destruction
0
K
System Runtime Hours
Since
0
Full-Scale Commercial Operation

ElectraCLEAR® breaks the cycle

Removing persistent chemicals isn’t the same as destroying them

Many treatment technologies separate contaminants from water or concentrate them into a smaller stream. electraCLEAR® takes the next step, using electrochemical oxidation to destroy the target compounds rather than leaving them to be managed elsewhere.

01
Isolate

Identify and isolate contaminated waste streams that require contaminate destruction.

02
Concentrate

Reduce treatment volume by concentrating contaminants into a smaller stream.

03
Destroy

electraCLEAR uses electrochemical oxidation to mineralize target compounds into simple, stable end products.

Applications

Built for difficult
industrial streams

Different industrial streams demand different treatment strategies. electraCLEAR systems are configured around wastewater chemistry, flow and treatment objectives.

white arrow pointing up and right

Priority Market

Landfill
leachate

Finish PFAS treatment in concentrated leachate streams with on-site destruction.

white arrow pointing up and right

Priority Market

Pharmaceutical
manufacturing

Treat rinses and side streams containing APIs and solvents on site, reducing reliance on off-site disposal.

Proven across other difficult industrial wastewater applications.

Your path to on-site treatment

From testing to full-scale treatment

Axine validates each application before full-scale deployment, using real wastewater and operating data to confirm performance, optimize treatment and inform system design.

circle-icon-waterdrop-blue

Treatment-fit review

Share your wastewater data so Axine can evaluate target contaminants, water chemistry, operating conditions and preliminary economics.

circle-icon-tube-blue

Bench-scale testing
6–8 weeks

Test a wastewater sample to demonstrate treatment performance and inform full-scale design considerations.

circle-icon-clipboard-blue

Pilot validation
6–8 weeks

Validate performance and optimize energy requirements at pilot scale, either at your site or Axine’s facility.

circle-icon-shield-aqua

Commercial Deployment
8–12 months

Finalize the commercial model and move from validated results to a full-scale electraCLEAR system designed for your application.

Flexible delivery

Choose the model that fits your operation

Choose the ownership, operating and support model that fits your needs.

01
Treatment-as-a-Service (TaaS)

Axine fully owns and operates the system at your site, with monitoring, maintenance and performance support included.

02
Purchase or lease

Own or lease the system while choosing the level of Axine operating support that fits your team.

03
Flexible operation

Choose between Axine-operated and customer-operated models, with ongoing support available either way.

04
Training + support

Access operator training, remote monitoring, system health and contaminant destruction reporting and field service support.

Backed by Proof

See electraCLEAR
in action

Explore case studies, application briefs, performance data and other resources that show how electraCLEAR performs across real wastewater applications.